Marsabit Times
Moderators: THEMAX, Roleplay Moderators
- PixelDubs
- TheoTown Veteran in Pension
- Posts: 590
- Joined: 02 Nov 2020, 20:14
- Location: Telford, England
- Plugins: Showcase Store
- Version: Beta
-
Plugin Creator
Platform
Re: Marsabit Times
FIRST EVER MOTORWAY OPENS IN MARSABIT
The 66 miles of the Trans Marsabit Motorwayhas opened the public.
After 3 years of construction, the road has opened as a toll road.
The entire motorway has been built to a D3M standard, with a speed limit of 70 mph.
There is traffic cameras along the entire motorway that are monitored 24/7 with Variable Speed Limit technology.
A lookback on the road
In 2013 the Marsabit - Chalinze road took over 10 hours to travel, large potholes and a narrow road resulted in lots of delays! In 2019 the road was repaired with road markings and safer junctions, reducing the journey time to 3 hours!
The motorway now reduces the journey time to 1 hour! Non motorway traffic can use nearby roads which have been upgraded to high quality!
The 66 miles of the Trans Marsabit Motorwayhas opened the public.
After 3 years of construction, the road has opened as a toll road.
The entire motorway has been built to a D3M standard, with a speed limit of 70 mph.
There is traffic cameras along the entire motorway that are monitored 24/7 with Variable Speed Limit technology.
A lookback on the road
In 2013 the Marsabit - Chalinze road took over 10 hours to travel, large potholes and a narrow road resulted in lots of delays! In 2019 the road was repaired with road markings and safer junctions, reducing the journey time to 3 hours!
The motorway now reduces the journey time to 1 hour! Non motorway traffic can use nearby roads which have been upgraded to high quality!